Been sorting bits and pieces out over the last few weeks.
Did a bottom end rebuild last weekend. New shells (Mains & Big Ends) High flow diesel pump and a new relief valve. Its good to have lots of pressure again. Was always down since the head cracked and contaminated the oil with a bit of water. Think the 200k mile old pump didn't like that.
Engine loom will be stripped this weekend as the start of fitting the Standalone.
Got an Emerald K6 ECU with much larger new injectors and all the bits I need for the conversion.
Got a deadline though: Mapping will be done by Dave Walker (the mapping king!) on 23rd July. I'll try to remember to take lots of pics and post up the RR readouts
Ben